- Water Treatment[2]
- Thyristors[6]
- Transistors[6]
- Integrated Circuits[3]
- Rectifiers[6]
- Other Active Components[3]
- Electric Water Heaters[1]
- Remote Control[2]
- Resistors[1]
- Multi-Functional Beauty Equipment[1]
- Other Lights & Lighting Products[6]
- Fuses[2]
- Transformers[1]
- Diodes[6]
- Electrical Contacts and Contact Materials[1]
- Other Electrical Equipment[1]
- Semiconductors[3]
- Other Fasteners[1]
- Capacitors[6]
- Car Reversing Aid[1]
- Other Motor[3]
- Other Exterior Accessories[3]
- Battery Packs[2]
- Wiring Harness[1]
- Magnetic Materials[6]
- Other Game Accessories[5]
- Contact Person : Mr. Chang John
- Company Name : Yangzhou Positioning Tech. Co., Ltd.
- Tel : 86-514-87360558,87782298,85889920,87782296
- Fax : 86-514-87782297,85889921,87367519 Address: Room 303 Weiheng Building No.20 B Area Lanyuan, Yangzhou City, Jiangsu Province. China Zip: 225009 Country/Region: China (Mainland) Province/State:
- Address : Jiangsu,Yangzhou,Room 303 Weiheng Building No.20 B Area Lanyuan, Yangzhou City, Jiangsu Province. China
- Country/Region : China
- Zip : 225009
Related Product Searches:Pure Water Cooling Installation,High Quality,Heat Generating Equipment Watercooling Equipment, Welding Machine Watercooling Equipment,Watercooling Equipment
1.The adopted principle of this new-type pure water cooling installation is the heat exchange between pure water and ambient air.
2.Present water cooling tower is suitable for various kind of power electronics and heat generating equipment which need water cooling, including NF, MF and IGBT power supply ,welding machine and laser equipment. It is also suitable for the cyclical cooling of heat treatment quenching liquid.
3.Present cooling installation does not need water pool and cooling tower. The cooling installation uses pure water to circulate the closed water path through the heat exchanger. The water quality is good, making the electrical cooling system and inductor not have incrustation and not be clogged. Thus it will decrease the trouble happening of the induction heating equipments (or other equipment).
This pure water cooling machine is divided two types: dry type air cooling machine and pure water cooling machine.
The advantages of this cooling installation are as follows:
The efficiency of heat exchange is high. The heat will be exhausted into air only by one time.(The internal & external circulating system need two times to exhaust the heat into air .)
Take less space.Have short pipe path and installation is convenient.Cheap in price.Consume less pure water, not needing pure water generator.(only adding enough pure water for one time, such as distilled water). Here after, replenish the pure water when the water level becomes lower.4. Technical Parameter
Type | Cooling Capability (kcal/h) | Working Pressure (Mpa) | Flow Capacity (m3/h) | Rated Voltage (V) | Fan Power (kw) | Volume of Water Tank (kg) | Outer Dimension (mm mm mm) | Weight (kg) |
FL-100BP | 31100 | 0.15 | 4-8 | 380 | 0.55 | 250 | 1300 1000 1700 2200 1100 1900 | 350 |
FL-160BP | 48160 | 0.20 | 8-16 | 380 | 0.75 | 250 | 1500 1300 1700 2300 1300 1900 | 700 |
FL-250BP | 75250 | 0.20 | 10-22 | 380 | 0.55x2 | 400 | 2300 1100 1800 3200 1100 1900 | 1000 |
FL-350BP | 105000 | 0.25 | 12-23 | 380 | 0.55x2 | 400 | 2300 1100 1800 3200 1100 1900 | 1100 |
FL-500BP | 150500 | 0.25 | 16-28 | 380 | 0.75x2 | 500 | 2800 1300 2200 | 1300 |
FL-600BP | 180600 | 0.30 | 23-32 | 380 | 1.1x2 | 500 | 2800 1300 2200 | 1400 |
FL-750BP | 228000 | 0.30 | 25-36 | 380 | 1.1x2 | 500 | 2800 1300 2300 | 1800 |
FL-1000BP | 301000 | 0.35 | 28-39 | 380 | 1.5x2 | 500 | 2800 1500 2600 | 2400 |
FL-1250BP | 352000 | 0.35 | 28-39 | 380 | 1.5x2 | 500 | 2800 1500 2800 | 2450 |
FL-1500BP | 451500 | 0.35 | 28-41 | 380 | 1.1x4 | 500 | 2800 1800 2800 | 2500 |
FL-2000BP | 602000 | 0.35 | 32-48 | 380 | 1.5x4 | 1000 | 2800 1800 2800 | 2700 |
FL-2500BP | 752500 | 0.35 | 36-55 | 380 | 1.5x4 | 1000 | 3100 2200 2900 | 2800 |
FL-3000BP | 903000 | 0.35 | 45-65 | 380 | 1.5x6 | 1000 | 2300 3600 2900 | 2900 |
5. Transpotation
We suggest that the lifting way to be the best proper way during transportation. Be sure to pay attention to avoid the paint on the tower body to be scraped by lifting rope or others during lifting operation. So, certain protective measurements should be taken before lifting. Also, attention should be paid to avoid the tower body to be impacted during lifting period.
Be careful to pay attention to guarantee the operator’s safety during lifting operation.
Pure Water Cooling Installation